Nobleton Water and Wastewater Servicing Municipal Class Environmental Assessment Study
York Region completed an Environmental Assessment Study in 2021 looking at the water and wastewater servicing options in the community of Nobleton in the Township of King.
Work is happening to implement the servicing solutions identified in the study.
Project Information
The projects listed below were identified through the Environmental Assessment process to support long-term water and wastewater servicing in Nobleton. Together, they will upgrade existing infrastructure, build new systems, improve service delivery, and support future growth.
Nobleton Sewage Pumping Station
York Region is upgrading and rehabilitating the Nobleton Sewage Pumping Station located at 66 Janet Avenue, in the Township of King.
- Notice of Construction - December 19, 2025
- Notice of Field Studies - May 30, 2025
Completion date: Summer 2028
Nobleton Water Resource Recovery Facility
York Region is upgrading the Nobleton Water Resource Recovery Facility to efficiently treat more wastewater, supporting community growth and the environment.
- Notice of Construction - April 17, 2026
Completion date: Fall 2028
Nobleton Water Treatment Plant
York Region is upgrading the well facilities and building a new Nobleton Water Treatment Plant to further enhance Nobleton’s drinking water system.
- Notice of construction - July 29, 2026
- Notice of tree removal - June 30, 2026
- Nobleton's Groundwater System - February 11, 2026
Completion date: December 2028
Learn about the Environmental Assessment Study
Study Background
In November 2018, The Regional Municipality of York initiated the Schedule C, Nobleton Water and Wastewater Servicing Municipal Class Environmental Assessment Study (EA Study). To accommodate future growth in the community, the EA Study looked at long-term water and wastewater servicing options in the Township of King.
During phase one, we hosted an Open House on February 28, 2019, and outlined the purpose and elements of the study. In phase two, we hosted a second online Open House on November 25, 2020, and reviewed the long-term water and wastewater servicing solutions that have been considered. The third online Open House was hosted on July 20, 2021, and the preferred design solutions for water and wastewater servicing and the recommended solutions were presented.
We completed the fourth phase and filed the Notice of Completion on November 3, 2021. The notice placed the completed Environmental Study Report on public record for a comment period of 32 days from November 4, 2021, to December 6, 2021.
Since the completion of the Class EA, additional updates were recommended by the Ministry of Environment, Conservation and Parks and a Notice of Addendum was issued. The Project File Report Addendum was on public record for review and comment from May 30, 2025, to June 30, 2025. The commenting period was extended to July 11, 2025.
The Nobleton Wells 2 & 5 EA Addendum Final report has been added to the Project Files and Environmental Study Report section below.
Notice of Addendum finalized for the revised Nobleton Water Servicing EA Study
The Nobleton Water Servicing solution has been updated through the Schedule C Municipal Class Environment Assessment for the Nobleton Wells 2 and 5 Upgrades Project - Addendum Report, dated August 13, 2025. The revised and final Addendum Report confirms the selected water servicing strategy for the community of Nobleton along with the completion of various investigative studies and reports to support the recommendation.
Stakeholder comments received on the draft Addendum Report, during the 30-day public review process from May 30, 2025, to July 11, 2025, have been addressed.
Read the Report and Project Files
- Notice of Addendum - May 30, 2025
- Environmental Study Report
- Nobleton Wells 2 & 5 EA Addendum Draft
- Nobleton Wells 2 & 5 EA Addendum Final (New - August 25, 2025)
Appendix A
- Phase 1 - Identify the Problem or Opportunity (page 1)
- Phase 2 - Identify Alternative Solutions (page 33)
- Phase 3 - Alternative Design Concepts (page 101)
- Phase 3 - Conceptual Design (page 272)
- Phase 3 - Conceptual Design Appendix A and B
- Evaluation Matrix (New - August 25, 2025)
Appendix B
- Study 1A: Water System Capacity Optimization Study
- Study 1B: Wastewater System Capacity Optimization Study
- Study 2A: Existing Water System Hydraulic Analysis
- Study 2A: Future Water System (Phase 2) Hydraulic Analysis
- Study 2B: Existing Wastewater System Hydraulic Analysis
- Study 3A: Water Needs Assessment and Justification Study
- Study 3B: Wastewater Needs Assessment and Justification Study
- Study 4: Technology Options to Meet Receiving Water Quality Study
- Study 5: Assimilative Capacity Study
- Study 6: Fluvial Geomorphology Assessment
- Study 7: Background Hydrogeological Assessment
- Study 7: Oak Ridges Moraine Conceptual Model Cross Section
- Air Quality Impact Assessment
- Stage 1 Archaeological Assessment pages 1-90
- Stage 1 Archaeological Assessment pages 91-129
- Archeological Assessment Report (New - May 30, 2025)
- Noise Impact Assessment
- Source Water Protection Memo
- Municipal Class EA Environmental Impact Study (EIS)
- Nobleton Supply Well Groundwater Exploration Program
- Cultural Heritage Report
- Geotechnical Investigation Report (New - May 30, 2025)
- Hydrogeological Impact Assessment Report (New - May 30, 2025)
- Natural Heritage Evaluation (New - May 30, 2025)
- Evaluation of Archaeological Potential (New - August 25, 2025)
- Heritage Impact Assessment Addendum (New - August 25, 2025)
Appendix C
- Notice of Study Commencement
- Public Engagement and Communications Plan
- Stakeholder Sensitivity Analysis
- Public Consultation Centre #1 Summary Report
- Public Consultation Centre #2 Summary Report
- Public Consultation Centre #3 Summary Report
- Notice of Completion
- Correspondence and Feedback from Stakeholders - 1 of 3
- Correspondence and Feedback from Stakeholders - 2 of 3
- Correspondence and Feedback from Stakeholders - 3 of 3
- Stakeholder Correspondence (New - May 30, 2025)
- Indigenous Consultation Log
- Correspondence with Indigenous Communities
- Summary of Responses and Comments (New - August 25, 2025)
Accessible formats or communication supports for this Environmental Study Report are available upon request. For more information, please contact @email or call 1-877-464-9675
Public Notices
- Notice of Addendum - May 30, 2025
- Addendum #1 (PDF)
- Notice of Completion - November 3, 2021
- Notice of Open House 3 - July 8, 2021
- Notice of Open House 2 - September 3, 2020
- Nobleton Water and Wastewater Servicing Update - May 12, 2020
- Notice of Open House 1 - February 14, 2019
- Notice of Study Commencement - November 15, 2018
Open House Information
Open House 3 was held on Tuesday, July 20, 2021
- Watch Open House 3 recording
- Download Open House 3 presentation
- Download Open House 3 presentation with speaking notes
- Public Consultation Centre 3 Summary Report
- Appendix A - Public Consultation Centre 3 Briefing
- Appendix B - Notice of Open House
- Appendix E - Survey Questions
- View Open House 3 Frequently Asked Questions
Open House 2 was held on Wednesday, November 25, 2020
- Watch Open House 2 recording
- Download Open House 2 presentation
- Download Open House 2 presentation with speaking notes
- Public Consultation Centre 2 Summary Report
- Appendix A - Public Consultation Centre 2 Briefing
- Appendix B - Notice of Open House
- Appendix E - Survey Questions
- View Open House 2 Frequently Asked Questions
If you have any questions, please contact:
York Region
1-877-464-9675
[email protected]