Teston Road IEA Study
City of Vaughan
The Regional Municipality of York is completing an individual Environmental Assessment (IEA) Study in the City of Vaughan to identify road improvements in the Teston Road area from Highway 400 to Bathurst Street and from Major Mackenzie Drive West to Kirby Road.
To address transportation challenges in the area, the study considered improvements for vehicles, pedestrians, cyclists and transit. Consultation with interested and/or affected parties is an essential part of the planning process and allows for identification and response to issues before decisions are made.
As required under the Ontario Environmental Assessment Act, York Region released the draft IEA Study Report for public review.
Comment period has closed
The draft Individual Environmental Assessment Report is available below for review, however, the comment period has concluded.
The Teston Road IEA Study will be submitted to the Ministry of the Environment, Conservation and Parks for review and approval.
View the draft Environmental Study Report and Appendices
- Teston Road IEA Report
- Appendix A - Terms of Reference
- Appendix B - Preferred Design Plan
- Appendix C.1 - Consultation Record
- Appendix C.2 - Consultation Record
- Appendix C.3 - Consultation Record
- Appendix C.4 - Consultation Record
- Appendix C.5 - Consultation Record
- Appendix C.6 - Consultation Record
- Appendix C.7 - Indigenous Consultation Record
- Appendix D.1 - Transportation System Technical Report #1
- Appendix D.2 - Transportation System Technical Report #2
- Appendix D.3 - Transportation System Technical Report #3
- Appendix E.1 - NatSci Report
- Appendix E.2 - NatSci Report
- Appendix F.1 - Arborist Report
- Appendix F.2 - Arborist Report
- Appendix F.3 - Arborist Report
- Appendix F.4 - Arborist Report
- Appendix G - Noise Report
- Appendix H - Air Report
- Appendix I - Stage 2 Arch Assessment
- Appendix J - Cultural Heritage Report
- Appendix K.1 - Drainage & Stormwater Management Report
- Appendix K.2 - Drainage & Stormwater Management Report
- Appendix K.3 - Drainage & Stormwater Management Report
- Appendix K.4 - Drainage & Stormwater Management Report
- Appendix K.5 - Drainage & Stormwater Management Report
- Appendix K.6 - Drainage & Stormwater Management Report
- Appendix K.7 - Drainage & Stormwater Management Report
- Appendix K.8 - Drainage & Stormwater Management Report
- Appendix K.9 - Drainage & Stormwater Management Report
- Appendix L - Hydrogeology Study Report
- Appendix M - Contamination Overview Study
Appendix available upon request by emailing @email - Appendix N.1 - Phase1 ESA Property 1 - 8 Report
Appendix available upon request by emailing @email - Appendix O - Soil Investigation Report
- Appendix P - Fluvial Geomorphology Report
- Appendix Q - Climate Change Report
- Appendix R.1 - Pavement Design Report
- Appendix R.2 - Foundations Report
- Appendix S - Structural Design Report
- Appendix T - Appendix T - Evaluation of Alternatives to the Undertaking
- Appendix U - Appendix U - Evaluation of Alternative Methods
- Appendix V - Design Criteria
- Appendix W - Preliminary Cost Estimate
Project Background
Public consultation is an important part of the IEA Study and York Region welcomes resident and stakeholder feedback throughout the study. Information about the study is posted on this page and on York Region’s Facebook and Twitter channels.
In December 2018, the Minister of the Environment, Conservation, and Parks approved the Terms of Reference for the Teston Road Area Transportation Improvements study. A copy of the approved Terms of Reference is available below.
Terms of Reference
As part of the planning process, York Region has developed the Terms of Reference to guide the future Individual Environmental Assessment Study.
- Teston Road IEA Terms of Reference Document
- Consultation Record
- Appendix A — Stakeholder List
- Appendix B — Consultation During Study
- Appendix C — Consultation During Pre-Submission
- Appendix D — Visual of Project Website
- Appendix E — Newspaper Notifications
- Appendix F — Open House Summary Report
- Appendix G — Agency Meeting Minutes
- Appendix H— Comments Responses Final
As of December 20, 2018, the Minister of the Environment, Conservation and Parks has approved the Terms of Reference for the preparation of the Teston Road Area Transportation Improvements Environmental Assessment. The project team will be proceeding with the Individual Environmental Assessment.
Public Notices
- Public Notice - November 8, 2024
- Notice of Open House #4 – November 23, 2023
- Notice of Open House #3 – March 17, 2022
- Notice of Open House #2 – November 25, 2021
- Notice of Open House #1 – July 23, 2021
- Notice of Commencement of Study – August 13, 2020
- Notice of Submission – June 7, 2018
- Notice of Open House – April 6, 2017
- Notice of Commencement for Terms of Reference – December 29, 2016
Public Open Houses
Throughout the EA Study, the public is encouraged to provide comments and feedback and submit questions regarding the project.
Open House 4 – December 1 to December 22, 2023
The following information was provided:
- Study progress since the third online open house
- Design considerations, preliminary design, potential impacts and mitigation measures
Open House 4 Material:
Project Summary Presentation (PDF) | Project Summary Video (13:34 minutes)
Open House #4 Presentation (PDF) | Open House #4 Video (23:33 minutes)
Open House 3 – March 21 to April 11, 2022
The following information was provided:
- Study progress since the second online open house
- Alternative designs to extend Teston Road from Keele Street to Dufferin Street
Open House 3 Material:
- Presentation - Project Summary (PDF) | Project Summary Video (6 minutes)
- Presentation (PDF) | Video (26 minutes)
Open House 2 – November 29 to December 20, 2021
The following information was provided:
- Background and summary of the study
- Alternative Methods to extend Teston Road between Keele Street and Dufferin Street
Open House 2 Material:
- Presentation – Project Summary (PDF) | Project Summary Video (5 minutes)
- Presentation (PDF) | Video (25 minutes)
Online Open House 1 – July 26 to August 23, 2021
The following information was provided:
- Background and summary of the study
- Problems and opportunities identified
- Alternatives being proposed
- Next steps in the study
Open House 1 Material:
- Presentation – Project Summary (PDF) | Project Summary Video (5 minutes)
- Presentation — Part 1 (PDF) | Part 1 Video (18 minutes)
- Presentation — Part 2 (PDF) | Part 2 Video (24 minutes)
Open House — April 18, 2017
The following information was provided:
- What is the ToR?
- Problems and Opportunities
- What happens next in the Study?
Terms of Reference Open House Material:
Join the project mailing list
To request to be added to the project mailing list, please contact us at @email or 1-877-464-9675 ext. 75000.
Road, Municipality: Teston Road, Vaughan
Project Number: 99816